Day 29 of our 2026 Adventure – a long chug 9 ½ miles

Obi had his poo walk with Sonia while I made breakfast, this morning was a mug or tea and toast and marmalade. After this I took a quick walk to the local shop to pick up some more Diet Coke, and a couple of beers also fell in to the basket. Then back to the boat and we are off.

Leaving Gnosall again
Leaving Gnosall again – a picture from the bow this time.

Today is going to be a extra hot one, and we debated leaving later or leaving now (11:18am) and we decided to just go for it as it was still going to be hot at 6pm and we wanted to find some shade by then.

Inside the Cowley Tunnel
Inside the Cowley Tunnel

Just as we exit Gnosall, we pass through the Cowley Tunnel, it is just a little one at just 74 meters. Just past the tunnel on the towpath side is a very large bank of Wild Orchids, that goes on for a few hundred meters, they really seem to like the conditions here, they have out grown almost all the competition except for the odd stinging nettle.

Wild Orchids
Wild Orchids

Today we pass a lot of moored boats taking shelter under the trees. I guess hoping to wait out the heat, like the best Mad Dogs and Englishmen, we continue as we have a pickup planned to collect two grand children who are joining us for a week on the canals.

Tree across the canal
Tree across the canal

After a short chug we come across a tree across the canal, as we get close we can see that we can probably push past without a problem. It looks like the top has been cut, a boat coming the other direction has pulled over to let us pass on the lefthand side of the canal, and after we have passed they do the same in the other direction.

Bridge 21 photo oppotunity
Bridge 21, it seemed too good an opportunity to miss taking a photo

I was at the bow of the boat as we approached Bridge 21, it seemed too good an opportunity to miss taking a photo. This is a canal we remember for its bridges.

Canal Boat Yard
Canal Boat Yard

I don’t know which boat yard this was, but lots of work going on building a canal boat as we passed, they also had a massive crane for lifting them on site.

Stretton Aqueduct over Watling Street
Stretton Aqueduct over Watling Street

Then we pass over Stretton Aqueduct again, as we travel along the canal we are often accompanied by herons, they take off as we approach and move along the canal with us, it has been hard to get a good picture of this one.

Herons follow us down the canal
Herons follow us down the canal

Another bridge we have mentioned in the past is Bridge 10, unlike almost all the others this one is definately for show.

Bridge 10 – Avenue Bridge again
Bridge 10 – Avenue Bridge again

After a lot of chugging in the heat of the day we finally moor up between Bridges 8 and 7, it is still very hot, but at least there is a breeze and we site on the back of the boat in popup chairs to cool down.

Just as I am writing this Sonia has spotted a Kingfisher, it had become a joke with Mary and I that Sonia would always be doing something when we had spotted one, this time she was ready, no picture they are very camera shy.

Travel Stats so far – Today we started moored at Gnosall visitor moorings completing 9 ½ miles to moor between bridges 8 and 7 so our new total is now 113 miles and we added one lock today so our total increases to 125, one tunnel today so that’s at 8 for the our first 29 days.