Chloe in and Floydtilla Out

At their Stoke Prior base Black Prince has what looks like a floating polly tunnel. They use this to float the boats into so they can control the conditions while they work on the paintwork, both stripping back to bare metal and respraying.

These picture cover a few weeks work in the tunnel.

Chloe in the paint tunnel
Chloe in the paint tunnel
Bit of a dent to repair
Bit of a dent to repair
Stripping the paint
Stripping the paint
On with the undercoat
On with the undercoat (note dent repaired)
Masked up being painted
Masked up being painted
Floydtilla Logo
Under the masting Chloe changes to Floydtilla