Day 71 of our 2026 Adventure – The 30 Lock Lass

Today we are doing the Tardebigge Lock Flight! It is the longest flight of locks in the UK, comprising 30 narrow locks on a two-and-a-quarter-mile (3.6 km) stretch of the Worcester and Birmingham Canal.

But before that Obi has his poo walk, and we have bacon in part bake rolls and a mug of tea. Yesterday the Tardebigge Lock Flight had been closed for ½ a day for repairs, and Sonia checked the CRT stoppages map and it is closed again today for a different lock, Lock 51 is being repaired.

Tardebigge Reservoir 24-09-26
Tardebigge Reservoir 24-09-26

I unfolded the Brompton and cycled down to have a look and one of the arms on the locks lower RH side was being removed and replaced. They expected to be finished by 2pm. I took a picture of the Tardebigge Reservoir and returned to the boat.

We decide to slowly move down to the lock 51/52 pound and wait for the work to complete.

In the Tardebigge Top Lock (Lock 58), I took a 360 image just before I exited the lock so you can see how deep it is.

Work was well under way by the time arrived,

At 2pm we set off again, the first through the fixed lock with its new temporary balance beam.

Lock 51 fixed on Tardebigge Flight
Lock 51 fixed on Tardebigge Flight

Just another 23 locks to go. We normally swap every five locks but this time, we are in a rhythm and I keep expecting Sonia to want to swap to being at the helm. I am guessing ½ way we will swap, then maybe ¾ but no Sonia keeps locking to the end.

Hyperlaspe
This is a 360° videoDrag to look around on YouTube Open on YouTube

Here is a quick hyperlapse video of some of our trip down the Tardebigge Flight.

We complete the Tardebigge Flight yet again
We complete the Tardebigge Flight yet again

Here she is the amazing ’30 Lock Lass’ by the end she is very tired. We started at 11am and finished at 6:45pm, we did have a short 2 ½ hour break while we waited for the lock to be repaired.

After that we made a pitstop at The Queens Head for beer and sustenance before retiring to bed and a well deserved sleep.

Travel Stats so far – Today we started at Tardebigge Wharf and finished moored opposite The Queens Head. Our total is now 217 miles and we have added 30 locks today so our total is now at 225, and no tunnels today, so that’s still 16 and only one swing bridge for our 71 days

Tardebigge Lock Flight Open, but still restricted

The BBC has reported that the Tardebigge locks are now open for navigation (27th August) see report on BBC site

But as of the 27th of August the CRT has put a restriction on the flight starting at lock 23 and continuing to lock 58 due to the water shortage :-

Quote from CRT Website

Following the driest March–July period since 1921 across central England, water availability in the region remains significantly below average. To help conserve increasingly limited water resources, protect canal infrastructure and ecology, and prolong navigation elsewhere on the network, Tardebigge Lock Flight will be open under navigation restrictions from Wednesday 27th August. This date aligns with the expected completion of repairs to Tardebigge Top Lock.

Passage will be permitted between 8:30 am and 3:00 pm, with the last entry at 12:00 noon. Boaters are reminded that the final opportunity to turn around before ascending the flight is just after Lock 23.

We will continue to manage the limited water situation and will provide updates if conditions change. Despite the measures we’re taking, there may be extreme local circumstances that require us to take immediate action to temporarily close some stretches to navigation.

If sufficient rainfall occurs to allow safe navigation, restrictions will be lifted immediately. However, this is likely to require sustained and prolonged rainfall over several weeks, rather than a single heavy downpour.

Thank you for your continued support in reducing water use across the network and for reporting leaks or concerns via 0303 040 4040 or our Contact Us page

From CRT Website 30-08-2025