Today we are doing the Tardebigge Lock Flight! It is the longest flight of locks in the UK, comprising 30 narrow locks on a two-and-a-quarter-mile (3.6 km) stretch of the Worcester and Birmingham Canal.
But before that Obi has his poo walk, and we have bacon in part bake rolls and a mug of tea. Yesterday the Tardebigge Lock Flight had been closed for ½ a day for repairs, and Sonia checked the CRT stoppages map and it is closed again today for a different lock, Lock 51 is being repaired.

I unfolded the Brompton and cycled down to have a look and one of the arms on the locks lower RH side was being removed and replaced. They expected to be finished by 2pm. I took a picture of the Tardebigge Reservoir and returned to the boat.
We decide to slowly move down to the lock 51/52 pound and wait for the work to complete.
In the Tardebigge Top Lock (Lock 58), I took a 360 image just before I exited the lock so you can see how deep it is.
Work was well under way by the time arrived,
At 2pm we set off again, the first through the fixed lock with its new temporary balance beam.

Just another 23 locks to go. We normally swap every five locks but this time, we are in a rhythm and I keep expecting Sonia to want to swap to being at the helm. I am guessing ½ way we will swap, then maybe ¾ but no Sonia keeps locking to the end.
Here is a quick hyperlapse video of some of our trip down the Tardebigge Flight.

Here she is the amazing ’30 Lock Lass’ by the end she is very tired. We started at 11am and finished at 6:45pm, we did have a short 2 ½ hour break while we waited for the lock to be repaired.
After that we made a pitstop at The Queens Head for beer and sustenance before retiring to bed and a well deserved sleep.
Travel Stats so far – Today we started at Tardebigge Wharf and finished moored opposite The Queens Head. Our total is now 217 miles and we have added 30 locks today so our total is now at 225, and no tunnels today, so that’s still 16 and only one swing bridge for our 71 days






