Between Birmingham and Worcester there lies a beast that is 2 ¼ Miles long, it backbone being made of 30 interconnected locks with it head 220 feet higher that its tail. that beast is know as the Tardebigge Flight of locks and we are at the tip of the tail.
The alarm goes off at 6am, we want to make a early start and catch it while it is still cool and we are fresh.

We are at the first lock by 7am, with Sonia locking the the first six and me the second six etc, most have been set for us with the chamber empty, but when it comes to the 2nd six I start to find the locks are full. This is very odd as nothing would have been on the locks since the last boat down yesterday.

The culprit was soon found, on each lock on the top side one of the Lock Paddle winding mechanisms was left with the paddle just open, not a massive leak by itself, but after 12 or so hours with it and about 6 others, it had left the lock pounds above lock 40 very low, I discovered this when a CRT man on a bicycle came and asked me if I had set any of the locks above me.
We then passed a boat going the other way down the locks, so all the lock would be set for us (with the locks empty), ready for us just to open the lower gates and chug in.
Then after just 3 more locks we had 2 lovely CRT Lockies come and ask us if we wanted any help, Sonia then went ahead and opens the lock ahead and the CRT Lockies, followed a long with the boat, filling, closing and opening the locks top gates.

Sonia and I swapped helm duties every 6 locks so as we got near the Tardebigge Reservoir it was my turn so I luckily had time to do my photo or the state of the reservoir.

Even after the super hot weather, we are lucky the reservoir is looking very heathy. You can see some other pictures in a previous blog post.
The loverly Lockies left us at lock 57, they had done for the day, the heat was excessive and they worked very hard, as volunteers they are resource that is much appreciated.

The last lock in the Tardebigge flight is lock 58, an it was this lock that was closed for rebuilding last year.

Next after the all the locks comes 3 tunnels, starting with the Tardebigge Tunnel which is 485 meters long and wide enough for two boats to pass in either direction.
Tunnels on a day like today are cool, in more senses that one, and we had three to do today, including the Tardebigge Tunnel, The Shortwood Tunnel at 560 meters, The Wast Hill Tunnel which was the longest of the day at 2493 meters

Moored up finally just before Kings Norton Junction where the Stratford Upon Avon Canal joins the Worcester and Birmingham. After 10 hours chugging, Locking we are both knackered, luckily Sonia cooks diner while I have a doze.
I will update the map later once I have had a sleep 🙂
Travel Stats so far – Today we completed just over 11 miles and 30 locks and 3 tunnels, bringing our total to 15 miles and 45 locks and 3 tunnels for the first 2 days




































